Sunday, December 23, 2012

hope to get some headway this week

installed the propane tanks



Tanks are from vintage trailer supply


Pip Boy has found his new home!



also got the first coat of urethane on installing doors tomorrow morning and painting second coat





installed the rockguard from vintage trailer supply, and removed the plywood window insert,



Starting to look like a trailer again.








 



Interior second coat

Sunday, December 16, 2012

interior

Backsplash and tile work is done

back splash was purchased at Lowes
http://www.lowes.com/pd_330828-82801-B63-29_0__?productId=3340940&Ntt=fasade+24-1%2F2-in+brushed+nickel+thermoplastic+multipurpose&pl=1&currentURL=%3FNtt%3Dfasade%2B24-1%252F2-in%2Bbrushed%2Bnickel%2Bthermoplastic%2Bmultipurpose&facetInfo=

installed using contact cement, overall came out better than I expected

Tile was closeout or leftover got the whole batch for 3 bucks, thanks to Garry Jeff for the excellent tile work